Logo
  • Home
  • About Us
    • Permaban
    • Somero
    • Face Consultants
    • Multiquip
  • News & Events
    • Event Success
    • MEIFC - Post Event
  • Guidance
    • Process Overview
    • Design
    • Materials
    • Placing
    • Finishing
    • Testing
    • Draft Specs & Guidance Documents
  • Projects
    • Case Histories
      • IKEA Greece
    • Photo Gallery
  • Resources
    • Industry Contacts
    • Publications
  • Conference
    • Event Success
    • Sponsors
    • M.E.I.F.C 2009 - Photos
Home arrow Projects arrow Case Histories
Case Histories PDF Print E-mail

HEFAME Pharmaceutical VNA Upgrade, Spain

Al Seer Group Oman

Imperial Tobacco Taiwan - Superflat Floor Laser Grinding Project

IKEA Australia Case Study

Amana Case Study

Dubai Mall Ice Rink Case Study

Mezzanine Deck Case Study

IKEA Greece Case Study

CBL Chemobau Case Study

 
[ Back ]
Concrete Grinding Ltd carried out laser grinding at IKEA’s new premises in Greece.
Read more about this IKEA Greece case study
Long Strip construction at Al Seer Group's new 10,000 sqm DC
Read more about Al Seer Group, Oman case study
The Laser Grinder® was utilised to upgrade 576 linear meters of aisle way, at ITTM, using 3-wheel track grinding.
Read more about
Imperial Tobacco Taiwan Manufacturing Co. Ltd  (ITTM) case study